人妻和老师做爰,《巨乳人妻》无删减电影,人妻在客厅被C的呻吟,巜饥渴的人妻日本》中字,《美味人妻3》韩国中文字幕,人妻洗澡被强公日日澡

Today:
首頁 > English > News Gallery > Company Everts > Company News

MBEC Wins the Bid of Sichuang-Tibet Highway Reconstruction Project

Source:    Date:2012-08-20  

Recently, MBEC won the bid of section II of national highway No. 318 Sichuang-Tibet highway (Tibet side) Tongmai to No.105 reconstruction project. The accepted contract amount is 344.5 million RMB and the construction period is 3 years.


The total length of this section is 2.8 km, including subgrade, pavement, super major bridge and culvert etc. Polonggou super major bridge e is a composite cable-stayed Bridge with a main span of 430m.. The middle span of the main girder is composite girder, the side span is prestressing concrete girder. The span arrangement is (45+50+60+430+60+50+46)m.. This bridge has been recognized as the “First Bridge” of Tibet. The total length of the culvert is 1390m and the construction method is drilling and blasting method.

up:

next:

云梦县| 苍梧县| 阿合奇县| 夏邑县| 南华县| 莱西市| 奈曼旗| 鹤庆县| 深圳市| 江城| 中方县| 舒城县| 雷波县| 岫岩| 桐梓县| 漾濞| 阳江市| 闽侯县| 马边| 乡宁县| 北京市| 定边县| 军事| 重庆市| 农安县| 江川县| 厦门市| 遵义市| 多伦县| 顺昌县| 民和| 卢氏县| 凤庆县| 山阳县| 调兵山市| 绥宁县| 饶阳县| 南陵县| 嵊州市| 吉安县| 米泉市|