人妻和老师做爰,《巨乳人妻》无删减电影,人妻在客厅被C的呻吟,巜饥渴的人妻日本》中字,《美味人妻3》韩国中文字幕,人妻洗澡被强公日日澡

Today:
首頁 > English > News Gallery > Company Everts > Company News

Wufengshan Yangtze River Bridge Opens to Traffic

Source:    Date:2021-07-07  

On June 30, the North-south highway connection of Wufengshan Yangtze River Bridge, the first rail-cum-road suspension bridge in China built by China Railway Major Bridge Engineering Group Co., Ltd. was opened to traffic. This highway is equipped with big data, cloud computing and other technologies, and is the first "future highway" in China.

Since October 2015, thousands of MBEC bridge builders have taken root at the foot of Wufeng Mountain and working hard for the construction of the bridge.

During the construction period of more than 5 years, the builders planned ahead and organized carefully to overcome difficulties such as complex geological conditions, difficult steel girders manufacturing and installation, high main cable installation accuracy and linear debugging requirements, strict environmental protection requirements, and high safety risks. The technical and management advantages of the bridge national team have adopted a series of new processes, new technologies, and new equipment.

Wufengshan Yangtze River Bridge is the first rail-cum-road suspension bridge in China, and it is also the fastest and largest loaded highway railway suspension bridge in the world. The bridge has a total length of 6409km with the main span of 1092m. The lower layer is a 4-line high-speed railway (two lines reserved) with a design speed of 250 km/h. The upper layer is a dual-way 8-lane highway with a design speed of 100 km/h.

up:

next:

常山县| 康乐县| 宜兰县| 襄城县| 武强县| 罗江县| 汪清县| 榕江县| 青铜峡市| 贵州省| 兰溪市| 静乐县| 望谟县| 调兵山市| 图木舒克市| 淮滨县| 元谋县| 女性| 灯塔市| 临颍县| 上高县| 石首市| 修文县| 博爱县| 郯城县| 枣阳市| 洛隆县| 分宜县| 江永县| 崇州市| 丽水市| 扬中市| 札达县| 韶山市| 辛集市| 英吉沙县| 水城县| 新乡市| 沅江市| 界首市| 恭城|